3 Safety in Tunneling Excavation
Charging of drilled holes and drilling shall not be carried out simultaneouslyin the same area ii Explosives and blasting • All precautions are to be taken as specified in Handling of Explosives iii Mucking plant and equipment • After blasting inside a tunnel or a shaft the roof and walls of the tunnel and sides of the shaft should be inspected by a tunnel foreman • Scaling